![]() ![]() A fourth hotel tower, with a budget of $250 million, is under construction and scheduled to open in early 2021.Īll these changes have left their mark, but two developments stand out among the rest. By 2008, ground had broken on yet another expansion, a $650 million project that included a third hotel tower, a 16,000-square-foot spa, a new showroom, restaurants, shops, three additional parking garages and a remodeled gaming floor. ![]() ![]() The very next year it broke ground on a second hotel tower, which added another 324 rooms to the mix. In 2002 the tribe completed an addition that included a 252-room hotel tower, 15,000 square feet of convention space, a gift shop, an indoor pool and an indoor waterfall. But back then it was a much smaller, much quieter place than the nearly 2 million-square-foot behemoth that exists today.Įxpansion was part of the plan from the beginning. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |